French bailey bridge

All topics related to Armortek's Bailey Bridge
Post Reply
Didier Molard
Posts: 3
Joined: Thu Feb 14, 2019 8:34 pm
Location: Lyon, France
Has liked: 1 time
Been Liked: 8 times

French bailey bridge

Post by Didier Molard » Tue Jul 23, 2019 1:29 pm

Hello all.
I apologize for the grammar of my english, i will use a corrector to ensure everything is ok.. but some errors may go through. :oops:
Having bought a kit some months ago, i started the built of it some days ago, thanks to holidays.
After a day work with a friend ( it's easier being 2 when it comes to bolt the component of the ramps !) a good part of the assembly is done, thanks to the good fititng of parts
anyway, still some job to be done to fully assemble it before disassembling and priming
p1.jpg
first base panels
p2.jpg
build of the day
regards

Didier Molard
Posts: 3
Joined: Thu Feb 14, 2019 8:34 pm
Location: Lyon, France
Has liked: 1 time
Been Liked: 8 times

Re: French bailey bridge

Post by Didier Molard » Thu Aug 15, 2019 10:48 am

hello. sorry for time between posts,
Some progress in the building, quite all elements fitted together now (was 2 weeks ago)
As said in other posts some adjustement needed with transom shoes (hole adjustement) to fit fixation holes in transom
same for all parts receiving the EN 120 pin using a step drill.
Capture.JPG
Capture.JPG (61.24 KiB) Viewed 182 times
assembly of bridge elements is now smooth, with no gap

next is to disassemble everythng, remove light rust on elements, apply etch primer and paint.
double single for assembly check
DSC_1043r.JPG
full single - need to create a support for the bearing plate so ramps can lay in correct position
20190731_194522r.jpg

Post Reply